Virtual Commissioning is a technology that allows to reproduce the dynamic and kinematic behavior of a machine or automatic system through a software simulation. It therefore allows emulation of the behavior of one or more hardware components in a virtual environment and is used to complement the engineering design of automatic machines or systems, as an advanced simulation tool.
The aim of the engineer who deals with Virtual Commissioning is to create a 3D digital model (digital twin), which allows simulating the operation of the application and therefore of all the designed elements. This simulation occurs by interfacing the model with the developed control software. The main advantage is to correct any errors before starting the manufacturing process for the construction of the components.
The purpose of this emulation is to anticipate the software testing phase, in the period in which the machine – or system – is still in the study phase. What makes the use of Virtual Commissioning fundamental is the possibility of removing errors before even producing the individual components of the machine or system. The aim, obviously, is to improve the quality of the operations already in the design phase. Virtual Commissioning also allows a transaction from the virtual to the physical environment, reducing both commissioning and testing times.
How does Virtual Commissioning work?
Hypertec Solution technicians initially create a 3D model (digital twin) of the machine/system, starting from the CAD project, in which the rigid bodies, the physical properties of the simulation and the kinematic constraints are defined and finally the actuators to transmit motion to the various kinematics and the sensors for the various control or feedback signals.
Subsequently the model is interfaced with the control software developed in the same automation platform that will be used on the machine/plant. In this phase you can use an emulator of the PLC or control system provided (in this case we talk about SIL – Software In the Loop simulation), or you can use a hardware CPU (in this case we talk about HIL – Hardware In simulation the Loop).
This allows to eliminate any design errors in the mechanics and at the same time in the control software, even before the mechanical parts have been produced and/or before the machine or system has been built and ready for actual commissioning.
Advantages derived from the use of Virtual Commissioning
The use of Virtual Commissioning enhances the design and production phases, offering clear and consistent advantages. The most obvious advantage is the reduction of time in the start-up and testing phase of the machine.
Virtual Commissioning can also be used for commercial or marketing purposes. If a demonstration presentation of the functioning of a machine or system is needed, a virtual simulation can be used as a preview.
Another advantage deriving from the use of Virtual Commissioning concerns the possibility of using the model for training activities for maintenance operators and for operators of the machines themselves.
CONTACT US FOR FURTHER INFORMATION